Uploaded image for project: 'IT: Release Engineering'
  1. IT: Release Engineering
  2. RELENG-2934

Redeuce costs - For Netvirt project CSIT job usage

Issue XMLXMLWordPrintable

    • Icon: Story Story
    • Resolution: Done
    • Icon: Normal Normal
    • None
    • None
    • None

      https://wiki.opendaylight.org/display/ODL/2020-05-27+Integration+Meeting+Minutes

      • the netvirt project working on reducing job usage (cost reduction)

        • the following table will be used to reduce job count

      ODL

      Openstack|
      Weekly/Daily|

      Aluminium

      Stein|
      Daily|

      Aluminium

      Queens|
      Daily|

      Aluminium

      Rocky|
      Daily|

      Magnesium

      Stein|
      Weekly|

      Magnesium

      Rocky|
      Daily|

      Magnesium

      Queens|
      Weekly|

      Sodium

      Rocky|
      Weekly|

      Sodium

      Queens|
      Weekly|

      • We need to try to resize our instances in our jobs. The number one cost is on odl-high-cpu-8 which is an 8 core, 8GB RAM

      which appears to be used in autorelease, netvirt and lisp. Maybe those jobs can be resized?

      • Another small low hanging fruit is the fix the scripts
         so that robot is not trying to run when the controller is not even running.

      • Srinivas Rachakonda
         has an idea to only trigger 3node netvirt jobs if it's accompanying 1node job passes 100%.

       

              askb Anil Belur
              askb Anil Belur
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Created:
                Updated:
                Resolved: